When repairs are carried out in the kitchen, one of the fundamental issues is the selection of the most suitable materials. Not everyone suits linoleum, because it is not appropriate in interiors, designed expensive. Ceramic tiles are much more beautiful. Therefore, many.
The first stage of its laying is to prepare the base. It is necessary to remove the old coating, and then check the condition of the screed. If there are small cracks on it, you can just dashcat them and level them. But if noticeable destruction is observed, the screed will have to be shifted. Some, after laying the tiles, install steel doors of Yoshkar Ola, they are inexpensive.
The cladding should begin from the center or from the side that is the farther from the door leading to the room. In the first case, the finish will turn out to be the most aesthetic, and in the second it will be possible to save the maximum amount of material. You can pre -lay out the tile on the floor to try on it.
It is necessary to fix the material on the adhesive composition. The floor is covered with a uniform layer, then it is leveled by the comb. When the entire floor is covered with tiles, you need to wait for the glue to dry, and then go to the grout of the seams. The sealant will protect them from moisture penetration and give a beautiful view.