High -quality plastering of walls directly depends on the preparation and processing of the base. The plaster should be done after the building is completely settled. On average, the sediment of the building takes about a year. Before plastering, it is necessary to check the walls for evenness, which allows you to more accurately calculate the material consumption, make an estimate and determine the labor costs. In order for the plaster to be firmly and qualitatively applied to the surface, it is necessary to clean it in advance and primed. On the walls, folded from blocks, cut the furrows with a chisel or make a notch.
If you want to buy a facing brick for the construction of a summer residence, but don’t know where? We advise you to buy a facing brick in Moscow at a reasonable price, you can find out in more detail by passing the link we specified.
If the surface area is large, then it should be treated with a pneumatic or electric hammer. On the walls of brick, experts leave in the inner seams between the bricks of the void with a depth of 1000 to 1500 mm. Then these voids are filled with a solution of plaster. This nuance provides reliable and strong adhesion of the plaster with the base. The greatest difficulty is the preparation of walls for plastering in wooden buildings. Preparing the wooden walls for plaster, they are offended with boat, that is, stolen planks. Their width is from 15 to 20 mm, thickness – from 3 to 5 mm and length – from 1000 to 2500 mm. Drani is attached to the wall with nails in the form of a grid at an angle of 45 degrees.