Redevelopment in the house is a popular way to make housing unique, diversify the space, having left standard partitions. Not everything is in the know, but the illegal demolition of the load -bearing walls can threaten serious fines and sanctions, up to the demand to return everything to the same place. Carry out redevelopment only in legitimate ways, and if it was required to dismantle, contact the company professionally demolition buildings and structures.
In the beginning, you need to determine the type of building where the redevelopment occurs. Not in all monolithic houses you can create anything with the walls, but not every panel house forbids you to touch the supporting structures. Monolithic buildings are erected from a reinforcing cage flooded with concrete, leaving apartments without partitions so that the owners themselves build the desired layout of the rooms. At the same time, panel houses of Soviet series exist two types: purely from panels and using a supporting frame. In the second case, the load carries a frame of reinforced concrete columns, so that it is not forbidden to dismantle buildings or walls. Of course, to determine the type of building only an expert, so you will not find your knowledge.
There are “prohibited techniques” that cannot be used in any case. In two -level housing, you cannot have a bathroom right above the kitchen. The transfer of the toilet is possible only in close -up rooms, such as a corridor or bath. When installing underfloor heating, it is forbidden to connect systems on water heating to the main engineering communications of the house. If the kitchen is a gas stove, then you can not remove the partition between the room and the dining area, and heating radiators cannot be taken to the balcony. Want to demolish the wall by law? Contact the BTI, where after studying the registration of the apartment you will be explained to you which walls can be cleaned. With a simple redevelopment, it is permissible to remove the non -consuming partitions, which then should be fixed on the plan of the house in BTI. With complex redevelopment, when the transfer of the load -bearing walls is required, they must create a reconstruction project that must be ordered in a design organization with admission to appropriate work.